| Item | Desciption | Unit | Quanity | Rate | Amount |
| 1 | Site establishment | sum | 1 | ||
| 2 | Contractual requirements | sum | 1 | ||
| 3 | Excavate and trim to lines and grades for foundations. | m³ | |||
| 4 | Excavate material behind proposed wall face to specified width and spoil, to allow for placement of geosynthetic reinforcement and imported fill | m³ | |||
| 5 | Excavate material behind proposed wall face to specified width and stockpile, to allow for placement of geosynthetic reinforcement and stockpiled fill. | m³ | |||
| 6 | trimming of batter faces to correct angle and embankment preparation work prior to placement of retaining wall blocks and fill | m² | |||
| 7 | Supply and place 20Mpa concrete in foundations as per detail, or | m³ | |||
| 8 | Supply and place crushed stone / gravel pad in foundations as per detail | m³ | |||
| 9 | Supply and place steel reinforcement in foundations and walls if specified | kg | |||
| 10 | Supply and
install TERRAFORCE BLOCKS TYPE ________ |
m² | |||
| 11 | Granular
fill from stockpile: Supply, spread in layers less than 150mm thick, water to optimum moisture content and compact fill to 90% Mod AASHTO |
m³ | |||
| 12 | Granular
fill supplied by others to the workface: Supply, spread in layers less than 150mm thick, water to optimum moisture content and compact fill to 90% Mod AASHTO |
m³ | |||
| 13 | Granular
fill obtained from commercial sources: Supply, spread in layers less than 150mm thick, water to optimum moisture content and compact fill to 90% Mod AASHTO |
m³ | |||
| 14 | Supply, install at specified elevation and orientation geosynthetic reinforcement type __________ Fill shall be placed, spread and compacted in such a manner that eliminates the developement of wrinkles and/or movement of geosynthetic reinforcement. | m² | |||
| 15 | Supply, install at specified elevation perforated drainage collection pipe type _________ to maintain gravity flow of water to outside of reinforced soil zone. | m | |||
| 16 | Wrap drainage collection pipe and 19mm drainage aggregate in drainage material type _________ | m | |||
| 17 | Supply and install drainage filter fabric type _______ along excavated batter as specified | m² | |||
| 18 | Supply and lay Findrain / Wickdrain ...mm wide at 45° angles along excavated batter at 2m centres, as per the specifications. Connect to perforated collector pipe. Pipe measured under item 15. | m | |||
| 19 | Fill retaining blocks with garden soil lightly tamped as the work proceeds | m³ | |||
| 20 | Professional Engineer's design fees | % | |||
| 21 | Professional Engineer's supervision fees | sum |